Assessment Year | 2003 |
---|---|
Principal Product | Industrial Cutting Tools |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3427: |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
42,000
ft2
|
Annual Production | 475,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,406 | 2,090,250 |
kWh
|
$0.032 |
Electricity Demand | $52,674 | 5,478 |
kW-mo/yr
|
$9.62 |
Natural Gas | $20,545 | 2,392 |
MMBtu
|
$8.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,959 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,180 | $17,325 |
$5,126
151,200
kWh
|
$3,054
-
kW-mo/yr
|
- | - | - | |
02 | 3.6192: Use a less expensive method of waste removal | $6,420 | $18,000 | - | - |
$(-7,305.0)
-
MMBtu
|
$13,725
-
gal
|
- | |
03 | 2.4112: Install soft-start to eliminate nuisance trips | $4,400 | $3,500 | - |
$4,400
-
kW-mo/yr
|
- | - | - | |
04 | 2.7261: Install timers and/or thermostats | $3,959 | $7,900 | - | - |
$3,959
-
MMBtu
|
- | - | |
05 | 3.7137: Replace cloth rags with paper towels | $1,980 | - | - | - | - | - | $1,980 | |
06 | 2.4224: Upgrade controls on compressors | $1,707 | $3,500 |
$1,707
50,335
kWh
|
- | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,053 | $740 |
$728
21,480
kWh
|
$325
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $27,699 | $50,965 |
$7,561
223,015
kWh
|
$7,779
-
kW-mo/yr
|
$(-3,346.0)
-
MMBtu
|
$13,725
-
gal
|
$1,980 | ||
TOTAL IMPLEMENTED | $22,959 | $46,725 |
$5,126
151,200
kWh
|
$7,454
-
kW-mo/yr
|
$(-3,346.0)
-
MMBtu
|
$13,725
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs