Assessment Year | 2005 |
---|---|
Principal Product | Plastics Injection Molding |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
350,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,003,807 | 42,282,000 |
kWh
|
$0.024 |
Electricity Demand | $394,269 | 66,543 |
kW-mo/yr
|
$5.93 |
Electricity Fees | $431,845 | - |
|
- |
Natural Gas | $28,274 | 2,815 |
MMBtu
|
$10.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $117,318 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,981 | $11,356 |
$4,016
118,936
kWh
|
$965
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,669 | $7,920 |
$20,669
612,064
kWh
|
- | - | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,357 | $23,560 |
$9,357
277,067
kWh
|
- | - | - | - | - | |
04 | 2.7135: Install occupancy sensors | $672 | $1,820 |
$672
19,885
kWh
|
- | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,800 | $5,000 |
$14,351
424,948
kWh
|
$3,449
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $39,487 | $48,800 |
$39,487
916,178
kWh
|
- | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,142 | $860 |
$166
4,906
kWh
|
$40
-
kW-mo/yr
|
- | $936 | - | - | |
08 | 4.611: Begin a practice of predictive / preventative maintenance | $4,000 | $3,000 | - | - | - | - | - | $4,000 | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $1,026 | $3,377 |
$464
13,732
kWh
|
$562
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.7261: Install timers and/or thermostats | $1,512 | $660 | - | - |
$1,512
-
MMBtu
|
- | - | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,871 | $1,327 |
$7,293
215,955
kWh
|
$1,778
-
kW-mo/yr
|
- | $(-200.0) | - | - | |
12 | 4.821: Pay bills on time to avoid late fees | $7,801 | - | - | - | - | - | $7,801 | - | |
TOTAL RECOMMENDED | $117,318 | $107,680 |
$96,475
2,603,671
kWh
|
$6,794
-
kW-mo/yr
|
$1,512
-
MMBtu
|
$736 | $7,801 | $4,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs