ITAC Assessment: WI0448
ITAC logo
ITAC Assessment: WI0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Laminating Products
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 240,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,488 2,796,133
kWh
Electricity Demand $55,683 6,834
kW-mo/yr
Electricity Fees $21,333 -
Natural Gas $35,856 6,630
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,587 $13,005 $3,209
128,624
kWh
$2,378
-
kW-mo/yr
- -
02 3.4111: Use closed cycle process to minimize waste water production $3,564 $4,300 - - - $3,564
-
Tgal
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,434 $1,918 $2,207
95,115
kWh
$1,227
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,870 $5,000 $1,870
80,586
kWh
- - -
05 2.7261: Install timers and/or thermostats $1,558 $1,200 - - $1,558
-
MMBtu
-
06 2.1133: Adjust burners for efficient operation $962 $500 - - $962
-
MMBtu
-
07 2.7135: Install occupancy sensors $610 $300 $610
26,334
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $509 $1,280 $315
13,564
kWh
$194
-
kW-mo/yr
- -
TOTAL RECOMMENDED $18,094 $27,503 $8,211
344,223
kWh
$3,799
-
kW-mo/yr
$2,520
-
MMBtu
$3,564
-
Tgal
TOTAL IMPLEMENTED $6,197 $13,305 $3,819
154,958
kWh
$2,378
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs