| Assessment Year | 2003 |
|---|---|
| Principal Product | Forming Fabric |
| NAICS | 314999: All Other Miscellaneous Textile Product Mills |
| SIC | 2299: Textile goods, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
90,000
ft2
|
| Annual Production | 3,000
thousand feet
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $127,103 | 6,016,918 |
kWh
|
$0.021 |
| Electricity Demand | $134,783 | 16,959 |
kW-mo/yr
|
$7.95 |
| Electricity Fees | $44,675 | - |
|
- |
| Natural Gas | $33,229 | 3,791 |
MMBtu
|
$8.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $72,467 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,996 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $62,019 | $150,000 |
$1,784
9,600
kWh
|
$79,968
-
kW-mo/yr
|
$(-19,733.0)
-
MMBtu
|
|
| 02 | 2.6121: Reduce hot water temperature to the minimum required | $6,058 | $4,500 | - | - |
$6,058
-
MMBtu
|
|
| 03 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $2,071 | $2,000 | - | - |
$2,071
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $381 | $740 |
$147
6,598
kWh
|
$234
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $1,938 | $2,600 |
$851
38,160
kWh
|
$1,087
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $72,467 | $159,840 |
$2,782
54,358
kWh
|
$81,289
-
kW-mo/yr
|
$(-11,604.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,996 | $7,100 |
$851
38,160
kWh
|
$1,087
-
kW-mo/yr
|
$6,058
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs