ITAC Assessment: WI0447
ITAC logo
ITAC Assessment: WI0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Forming Fabric
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 90,000
ft2
Annual Production 3,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,103 6,016,918
kWh
Electricity Demand $134,783 16,959
kW-mo/yr
Electricity Fees $44,675 -
Natural Gas $33,229 3,791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $62,019 $150,000 $1,784
9,600
kWh
$79,968
-
kW-mo/yr
$(-19,733.0)
-
MMBtu
02 2.6121: Reduce hot water temperature to the minimum required $6,058 $4,500 - - $6,058
-
MMBtu
03 2.2426: Use waste heat from flue gases to heat space conditioning air $2,071 $2,000 - - $2,071
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $381 $740 $147
6,598
kWh
$234
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,938 $2,600 $851
38,160
kWh
$1,087
-
kW-mo/yr
-
TOTAL RECOMMENDED $72,467 $159,840 $2,782
54,358
kWh
$81,289
-
kW-mo/yr
$(-11,604.0)
-
MMBtu
TOTAL IMPLEMENTED $7,996 $7,100 $851
38,160
kWh
$1,087
-
kW-mo/yr
$6,058
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs