ITAC Assessment: WI0438
ITAC logo
ITAC Assessment: WI0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Injection Molding/ Urethane Load Wheels
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 86,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,735 7,033,000
kWh
Electricity Demand $127,645 16,836
kW-mo/yr
Electricity Fees $23,207 -
Natural Gas $37,754 6,969
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,507

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,005 $15,000 - $9,005
-
kW-mo/yr
- -
02 3.6194: Ship hydraulic oil to secondary fuel program $4,455 $5,000 - - - $4,455
-
gal
03 3.7393: Implement a machine and coolant sump cleaning program to minimize coolant contamination $2,640 $8,000 - - - $2,640
-
gal
04 2.2437: Recover waste heat from equipment $1,901 $1,000 - - $1,901
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $1,793 $2,800 - - $1,793
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $353 $120 $257
8,004
kWh
$96
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $261 $640 $184
5,515
kWh
$77
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,408 $32,560 $441
13,519
kWh
$9,178
-
kW-mo/yr
$3,694
-
MMBtu
$7,095
-
gal
TOTAL IMPLEMENTED $17,507 $23,920 $257
8,004
kWh
$9,101
-
kW-mo/yr
$3,694
-
MMBtu
$4,455
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs