Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CUSTOM HEAT TREATING
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $5
M
to 10
M
# of Employees 83
Plant Area
n/a
Annual Production 12,800,000
lb
Production Hrs. Annual 6,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $357,551 4,540,739
kWh
Natural Gas $526,054 88,913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $862 $193 $862
10,844
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,538 $70 $4,538
57,737
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,813 $821 $1,813
23,154
kWh
-
04 2.3191: Use demand controller or load shedder $32,041 $30,000 $32,041
-
kWh
-
05 2.2425: Use flue gases to heat process or service water $134,226 $93,000 - $134,226
-
MMBtu
TOTAL RECOMMENDED $173,480 $124,084 $39,254
91,735
kWh
$134,226
-
MMBtu
TOTAL IMPLEMENTED $134,226 $93,000 - $134,226
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs