ITAC Assessment: WI0433
ITAC logo
ITAC Assessment: WI0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Architectural Glass
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 44,000
ft2
Annual Production 2,225
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,504 6,957,600
kWh
Electricity Demand $141,439 14,306
kW-mo/yr
Electricity Fees $55,568 -
Natural Gas $4,583 793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,615

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 3.1193: Convert from batch operation to continuous processing $14,150 $13,000 $(-1,200.0)
(-47,058)
kWh
- - $18,600
-
Tgal
$(-3,250.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,467 $20,000 $9,467
420,744
kWh
- - - -
03 2.3191: Use demand controller or load shedder $4,530 $1,000 $4,028
179,040
kWh
$8,402
-
kW-mo/yr
$(-7,900.0)
-
MMBtu
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,251 $1,100 - - $2,251
-
MMBtu
- -
05 2.7135: Install occupancy sensors $1,228 $4,000 $528
23,499
kWh
$700
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $519 $740 $321
14,301
kWh
$198
-
kW-mo/yr
- - -
07 2.7224: Reduce space conditioning during non-working hours $286 $800 - - $286
-
MMBtu
- -
TOTAL RECOMMENDED $32,431 $40,640 $13,144
590,526
kWh
$9,300
-
kW-mo/yr
$(-5,363.0)
-
MMBtu
$18,600
-
Tgal
$(-3,250.0)
TOTAL IMPLEMENTED $27,615 $38,840 $9,116
411,486
kWh
$898
-
kW-mo/yr
$2,251
-
MMBtu
$18,600
-
Tgal
$(-3,250.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs