ITAC Assessment: WI0417
ITAC logo
ITAC Assessment: WI0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product CNC Precision Machining
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 80,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,031 2,713,233
kWh
Electricity Demand $54,359 5,138
kW-mo/yr
Electricity Fees $13,282 -
Natural Gas $24,413 3,001
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $8,160 $2,000 - - $8,160
-
MMBtu
- -
02 3.4113: Treat and reuse rinse waters $7,660 $8,000 - - - - $7,660
03 3.7137: Replace cloth rags with paper towels $4,700 - - - - $4,700
-
lb
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,600 $1,100 - - $2,600
-
MMBtu
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,453 $1,560 - - $2,453
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,606 $339 $842
21,600
kWh
$764
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $1,318 $740 $963
24,699
kWh
$355
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $923 $1,647 $678
17,396
kWh
$245
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $29,420 $15,386 $2,483
63,695
kWh
$1,364
-
kW-mo/yr
$13,213
-
MMBtu
$4,700
-
lb
$7,660
TOTAL IMPLEMENTED $19,667 $12,726 $2,483
63,695
kWh
$1,364
-
kW-mo/yr
$8,160
-
MMBtu
- $7,660
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs