| Assessment Year | 2002 |
|---|---|
| Principal Product | CNC Precision Machining |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
80,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,031 | 2,713,233 |
kWh
|
$0.032 |
| Electricity Demand | $54,359 | 5,138 |
kW-mo/yr
|
$10.58 |
| Electricity Fees | $13,282 | - |
|
- |
| Natural Gas | $24,413 | 3,001 |
MMBtu
|
$8.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,667 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $8,160 | $2,000 | - | - |
$8,160
-
MMBtu
|
- | - | |
| 02 | 3.4113: Treat and reuse rinse waters | $7,660 | $8,000 | - | - | - | - | $7,660 | |
| 03 | 3.7137: Replace cloth rags with paper towels | $4,700 | - | - | - | - |
$4,700
-
lb
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,600 | $1,100 | - | - |
$2,600
-
MMBtu
|
- | - | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,453 | $1,560 | - | - |
$2,453
-
MMBtu
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,606 | $339 |
$842
21,600
kWh
|
$764
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,318 | $740 |
$963
24,699
kWh
|
$355
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $923 | $1,647 |
$678
17,396
kWh
|
$245
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $29,420 | $15,386 |
$2,483
63,695
kWh
|
$1,364
-
kW-mo/yr
|
$13,213
-
MMBtu
|
$4,700
-
lb
|
$7,660 | ||
| TOTAL IMPLEMENTED | $19,667 | $12,726 |
$2,483
63,695
kWh
|
$1,364
-
kW-mo/yr
|
$8,160
-
MMBtu
|
- | $7,660 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs