ITAC Assessment: WM0026
ITAC logo
ITAC Assessment: WM0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product aluminum castings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $50
M
to 100
M
# of Employees 106
Plant Area 104,983
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,466 7,854,336
kWh
Electricity Demand $153,036 17,278
kW-mo/yr
Electricity Fees $34,506 -
Natural Gas $51,944 7,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $586 $424 - - $586
-
MMBtu
-
02 2.7135: Install occupancy sensors $1,319 $2,730 $1,319
25,867
kWh
- - -
03 2.7229: Air condition only space necessary $2,884 - - - $2,884
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,454 $1,526 - - $1,454
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $239 $410 $112
1,752
kWh
$27
-
kW-mo/yr
- $100
06 2.7142: Utilize higher efficiency lamps and/or ballasts $18,054 $33,056 $18,054
354,000
kWh
- - -
TOTAL RECOMMENDED $24,536 $38,146 $19,485
381,619
kWh
$27
-
kW-mo/yr
$4,924
-
MMBtu
$100
TOTAL IMPLEMENTED $19,508 $34,582 $18,054
354,000
kWh
- $1,454
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs