Assessment Year | 2004 |
---|---|
Principal Product | Fuel filter cartridges |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
72,000
ft2
|
Annual Production | 780,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,574 | 1,947,240 |
kWh
|
$0.047 |
Electricity Demand | $15,605 | 7,158 |
kW-mo/yr
|
$2.18 |
Electricity Fees | $8,082 | - |
|
- |
Natural Gas | $73,936 | 9,802 |
MMBtu
|
$7.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,222 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.611: Begin a practice of predictive / preventative maintenance | $11,600 | - | - | - | - | - | - | $11,600 | - | |
02 | 2.8118: Check for accuracy of utility / power meters | $2,218 | $100 | - | - | - | - | - | - | $2,218 | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,032 | $1,400 | - |
$3,032
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.5113: Use direct flame impingement or infrared processing for chamber type heating | $15,364 | $10,542 | - | - |
$7,452
-
MMBtu
|
$742
-
Tgal
|
$370
-
gal
|
$6,800 | - | |
05 | 2.7135: Install occupancy sensors | $356 | $269 |
$356
12,160
kWh
|
- | - | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $837 | $730 |
$985
33,609
kWh
|
$52
-
kW-mo/yr
|
- | - | - | $(-200.0) | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $369 | $360 |
$121
4,117
kWh
|
$41
-
kW-mo/yr
|
- | - | - | $207 | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,392 | $3,349 |
$663
22,623
kWh
|
$466
-
kW-mo/yr
|
- | - | - | $263 | - | |
09 | 2.7241: Install outside air damper / economizer on hvac unit | $5,054 | $18,900 |
$5,054
172,502
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $40,222 | $35,650 |
$7,179
245,011
kWh
|
$3,591
-
kW-mo/yr
|
$7,452
-
MMBtu
|
$742
-
Tgal
|
$370
-
gal
|
$18,670 | $2,218 | ||
TOTAL IMPLEMENTED | $14,198 | $4,439 |
$1,769
60,349
kWh
|
$559
-
kW-mo/yr
|
- | - | - | $11,870 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs