ITAC Assessment: OK0697
ITAC logo
ITAC Assessment: OK0697
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fuel filter cartridges
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 72,000
ft2
Annual Production 780,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,574 1,947,240
kWh
Electricity Demand $15,605 7,158
kW-mo/yr
Electricity Fees $8,082 -
Natural Gas $73,936 9,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.611: Begin a practice of predictive / preventative maintenance $11,600 - - - - - - $11,600 -
02 2.8118: Check for accuracy of utility / power meters $2,218 $100 - - - - - - $2,218
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,032 $1,400 - $3,032
-
kW-mo/yr
- - - - -
04 2.5113: Use direct flame impingement or infrared processing for chamber type heating $15,364 $10,542 - - $7,452
-
MMBtu
$742
-
Tgal
$370
-
gal
$6,800 -
05 2.7135: Install occupancy sensors $356 $269 $356
12,160
kWh
- - - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $837 $730 $985
33,609
kWh
$52
-
kW-mo/yr
- - - $(-200.0) -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $369 $360 $121
4,117
kWh
$41
-
kW-mo/yr
- - - $207 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,392 $3,349 $663
22,623
kWh
$466
-
kW-mo/yr
- - - $263 -
09 2.7241: Install outside air damper / economizer on hvac unit $5,054 $18,900 $5,054
172,502
kWh
- - - - - -
TOTAL RECOMMENDED $40,222 $35,650 $7,179
245,011
kWh
$3,591
-
kW-mo/yr
$7,452
-
MMBtu
$742
-
Tgal
$370
-
gal
$18,670 $2,218
TOTAL IMPLEMENTED $14,198 $4,439 $1,769
60,349
kWh
$559
-
kW-mo/yr
- - - $11,870 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings