ITAC Assessment: WI0400
ITAC logo
ITAC Assessment: WI0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Finishing Operations
NAICS
n/a
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 61,895
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,151 1,500,642
kWh
Electricity Demand $36,588 4,421
kW-mo/yr
Electricity Fees $4,120 -
Natural Gas $2,818 500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.445: Install equipment to move product $104,000 $4,000 - - - $104,000 -
02 2.3191: Use demand controller or load shedder $7,857 $10,000 - $7,857
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $1,503 $1,500 $937
27,648
kWh
$566
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $838 $3,744 $605
17,856
kWh
$233
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $211 $300 $211
6,210
kWh
- - - -
06 3.7137: Replace cloth rags with paper towels $1,277 - - - - - $1,277
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $738 $2,000 $409
12,058
kWh
$329
-
kW-mo/yr
- - -
08 2.4221: Install compressor air intakes in coolest locations $605 $640 $436
12,872
kWh
$169
-
kW-mo/yr
- - -
09 2.7261: Install timers and/or thermostats $209 $400 - - $209
-
MMBtu
- -
TOTAL RECOMMENDED $117,238 $22,584 $2,598
76,644
kWh
$9,154
-
kW-mo/yr
$209
-
MMBtu
$104,000 $1,277
TOTAL IMPLEMENTED $814 $1,040 $436
12,872
kWh
$169
-
kW-mo/yr
$209
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs