| Assessment Year | 2001 |
|---|---|
| Principal Product | Commercial Newspapers |
| NAICS |
n/a
|
| SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
| Sales Range | $50 M to 100M |
| # of Employees | 500 |
| Plant Area |
220,000
ft2
|
| Annual Production | 51,792,000
pieces
|
| Production Hrs. Annual | 7,072
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $173,197 | 5,611,928 |
kWh
|
$0.031 |
| Electricity Demand | $123,761 | 14,151 |
kW-mo/yr
|
$8.75 |
| Electricity Fees | $23,131 | - |
|
- |
| Natural Gas | $25,686 | 5,115 |
MMBtu
|
$5.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,686 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $32,472 | $1,611 | n/a | - | - | - | - | $32,472 |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,875 | $34,038 | n/a |
$5,789
177,578
kWh
|
$2,086
-
kW-mo/yr
|
- | - | - |
| 03 | 3.6192: Use a less expensive method of waste removal | $4,800 | - | n/a | - | - | - |
$4,800
-
lb
|
- |
| 04 | 2.7251: Reduce air conditioning load by evaporating water from roof | $4,549 | $9,975 | n/a |
$2,451
75,176
kWh
|
$2,168
-
kW-mo/yr
|
$(-70.0)
-
Tgal
|
- | - |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,778 | $2,000 | n/a |
$1,474
45,219
kWh
|
$1,304
-
kW-mo/yr
|
- | - | - |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,579 | $1,280 | n/a |
$1,161
35,614
kWh
|
$418
-
kW-mo/yr
|
- | - | - |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,450 | $1,263 | n/a |
$676
20,722
kWh
|
$774
-
kW-mo/yr
|
- | - | - |
| 08 | 3.4115: Recover and reuse cooling water | $1,183 | $5,250 | n/a |
$(-1,291.0)
(-39,568)
kWh
|
$(-619.0)
-
kW-mo/yr
|
$3,093
-
Tgal
|
- | - |
| TOTAL RECOMMENDED | $56,686 | $55,417 |
$10,260
314,741
kWh
|
$6,131
-
kW-mo/yr
|
$3,023
-
Tgal
|
$4,800
-
lb
|
$32,472 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs