ITAC Assessment: WI0391
ITAC logo
ITAC Assessment: WI0391
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 75,500
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,940 1,800,887
kWh
Electricity Demand $53,329 5,210
kW-mo/yr
Electricity Fees $6,476 -
Natural Gas $11,147 2,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3134: Shift from daytime to nighttime operation $19,523 - - $19,523
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,794 $90 $1,616
48,657
kWh
$1,178
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $393 $640 $227
6,836
kWh
$166
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,913 $971 - - $1,913
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $372 $2,000 $372
11,190
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $364 $283 $220
6,631
kWh
$144
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $130 - $75
2,266
kWh
$55
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,489 $3,984 $2,510
75,580
kWh
$21,066
-
kW-mo/yr
$1,913
-
MMBtu
TOTAL IMPLEMENTED $3,187 $730 $1,843
55,493
kWh
$1,344
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs