ITAC Assessment: IP0008
ITAC logo
ITAC Assessment: IP0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product office furniture
NAICS 337127: Institutional Furniture Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 203
Plant Area 135,000
ft2
Annual Production 131,119
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,326 2,911,120
kWh
Electricity Demand $65,779 9,997
kW-mo/yr
Electricity Fees $18,358 -
Natural Gas $75,494 9,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,340 - $16,340
263,783
kWh
- -
02 2.4224: Upgrade controls on compressors $3,853 - - $3,853
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,703 - $2,098
33,871
kWh
$605
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,234 - $958
15,470
kWh
$276
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $5,583 $900 - - $5,583
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $2,117 $449 $1,643
26,520
kWh
$474
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $282 $107 $282
4,561
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,510 $9,972 $5,828
94,146
kWh
$1,682
-
kW-mo/yr
-
09 2.4131: Size electric motors for peak operating efficiency $7,093 $15,665 $5,508
88,915
kWh
$1,585
-
kW-mo/yr
-
10 2.1135: Repair furnaces and oven doors so that they seal efficiently $11,117 $33,000 - - $11,117
-
MMBtu
TOTAL RECOMMENDED $57,832 $60,093 $32,657
527,266
kWh
$8,475
-
kW-mo/yr
$16,700
-
MMBtu
TOTAL IMPLEMENTED $31,640 $9,972 $25,224
407,270
kWh
$6,416
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings