ITAC Assessment: WI0385
ITAC logo
ITAC Assessment: WI0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Classroom and Cafeteria Furniture
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $5
M
to 10
M
# of Employees 77
Plant Area 139,150
ft2
Annual Production 53,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,610 433,763
kWh
Electricity Demand $13,417 1,775
kW-mo/yr
Electricity Fees $2,698 -
Natural Gas $34,773 6,436
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $213,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $152,011 $27,200 - - - - $(-97,828.0) $300,000 $(-50,161.0)
02 4.522: Modify storage space to avoid rental of a warehouse $23,175 $15,487 - - - - - $23,175 -
03 4.514: Re-arrange equipment layout to reduce handling costs $15,000 $10,000 - - - - - $15,000 -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,415 - - - - $7,415
-
lb
- - -
05 2.7261: Install timers and/or thermostats $5,954 $1,200 - - $5,954
-
MMBtu
- - - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,665 $1,000 - - - - - - $3,665
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,895 $60 $1,730
34,584
kWh
$1,165
-
kW-mo/yr
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $404 $740 $219
4,396
kWh
$185
-
kW-mo/yr
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,819 $6,986 $1,092
21,688
kWh
$727
-
kW-mo/yr
- - - - -
10 2.2437: Recover waste heat from equipment $459 $2,000 - - $459
-
MMBtu
- - - -
11 2.7314: Reduce ventilation air $436 $1,000 $60
1,172
kWh
- $376
-
MMBtu
- - - -
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $167 $245 $99
2,052
kWh
$68
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $213,400 $65,918 $3,200
63,892
kWh
$2,145
-
kW-mo/yr
$6,789
-
MMBtu
$7,415
-
lb
$(-97,828.0) $338,175 $(-46,496.0)
TOTAL IMPLEMENTED $41,070 $25,547 $1,730
34,584
kWh
$1,165
-
kW-mo/yr
- - - $38,175 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs