Assessment Year | 2000 |
---|---|
Principal Product | Classroom and Cafeteria Furniture |
NAICS |
n/a
|
SIC | 2531: Public Building and Related Furniture |
Sales Range | $5 M to 10M |
# of Employees | 77 |
Plant Area |
139,150
ft2
|
Annual Production | 53,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $20,610 | 433,763 |
kWh
|
$0.048 |
Electricity Demand | $13,417 | 1,775 |
kW-mo/yr
|
$7.56 |
Electricity Fees | $2,698 | - |
|
- |
Natural Gas | $34,773 | 6,436 |
MMBtu
|
$5.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $213,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,070 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $152,011 | $27,200 | - | - | - | - | $(-97,828.0) | $300,000 | $(-50,161.0) | |
02 | 4.522: Modify storage space to avoid rental of a warehouse | $23,175 | $15,487 | - | - | - | - | - | $23,175 | - | |
03 | 4.514: Re-arrange equipment layout to reduce handling costs | $15,000 | $10,000 | - | - | - | - | - | $15,000 | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,415 | - | - | - | - |
$7,415
-
lb
|
- | - | - | |
05 | 2.7261: Install timers and/or thermostats | $5,954 | $1,200 | - | - |
$5,954
-
MMBtu
|
- | - | - | - | |
06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $3,665 | $1,000 | - | - | - | - | - | - | $3,665 | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,895 | $60 |
$1,730
34,584
kWh
|
$1,165
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $404 | $740 |
$219
4,396
kWh
|
$185
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,819 | $6,986 |
$1,092
21,688
kWh
|
$727
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 2.2437: Recover waste heat from equipment | $459 | $2,000 | - | - |
$459
-
MMBtu
|
- | - | - | - | |
11 | 2.7314: Reduce ventilation air | $436 | $1,000 |
$60
1,172
kWh
|
- |
$376
-
MMBtu
|
- | - | - | - | |
12 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $167 | $245 |
$99
2,052
kWh
|
$68
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $213,400 | $65,918 |
$3,200
63,892
kWh
|
$2,145
-
kW-mo/yr
|
$6,789
-
MMBtu
|
$7,415
-
lb
|
$(-97,828.0) | $338,175 | $(-46,496.0) | ||
TOTAL IMPLEMENTED | $41,070 | $25,547 |
$1,730
34,584
kWh
|
$1,165
-
kW-mo/yr
|
- | - | - | $38,175 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs