Assessment Year | 2000 |
---|---|
Principal Product | Blow Molded and Injection Molded Housewares |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
220,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $455,875 | 10,305,100 |
kWh
|
$0.044 |
Electricity Demand | $159,342 | 21,552 |
kW-mo/yr
|
$7.39 |
Electricity Fees | $37,363 | - |
|
- |
Natural Gas | $25,704 | 6,999 |
MMBtu
|
$3.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,225 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7251: Reduce air conditioning load by evaporating water from roof | $11,648 | $23,400 |
$8,165
176,436
kWh
|
$4,260
-
kW-mo/yr
|
$(-777.0)
-
Tgal
|
- | - | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $850 | $2,000 |
$558
12,016
kWh
|
$292
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $11,276 | $34,000 |
$9,096
196,366
kWh
|
$2,180
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $6,099 | $1,680 |
$4,968
107,268
kWh
|
$1,131
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 3.6192: Use a less expensive method of waste removal | $5,144 | - | - | - | - | - |
$5,144
-
lb
|
- | - | |
06 | 2.7135: Install occupancy sensors | $3,123 | $7,200 |
$1,753
37,808
kWh
|
$1,370
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,081 | $6,484 |
$2,494
53,927
kWh
|
$587
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 3.8142: Distill contaminated solvents for reuse | $2,899 | $5,700 | - | - | - |
$3,788
-
gal
|
$(-246.0)
-
lb
|
$(-370.0) | $(-273.0) | |
09 | 2.3132: Recharge batteries on during off-peak demand periods | $1,250 | $1,400 | - |
$1,250
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $45,370 | $81,864 |
$27,034
583,821
kWh
|
$11,070
-
kW-mo/yr
|
$(-777.0)
-
Tgal
|
$3,788
-
gal
|
$4,898
-
lb
|
$(-370.0) | $(-273.0) | ||
TOTAL IMPLEMENTED | $8,225 | $6,484 |
$2,494
53,927
kWh
|
$587
-
kW-mo/yr
|
- | - |
$5,144
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs