ITAC Assessment: WI0382
ITAC logo
ITAC Assessment: WI0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Blow Molded and Injection Molded Housewares
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 220,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,875 10,305,100
kWh
Electricity Demand $159,342 21,552
kW-mo/yr
Electricity Fees $37,363 -
Natural Gas $25,704 6,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7251: Reduce air conditioning load by evaporating water from roof $11,648 $23,400 $8,165
176,436
kWh
$4,260
-
kW-mo/yr
$(-777.0)
-
Tgal
- - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $850 $2,000 $558
12,016
kWh
$292
-
kW-mo/yr
- - - - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $11,276 $34,000 $9,096
196,366
kWh
$2,180
-
kW-mo/yr
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $6,099 $1,680 $4,968
107,268
kWh
$1,131
-
kW-mo/yr
- - - - -
05 3.6192: Use a less expensive method of waste removal $5,144 - - - - - $5,144
-
lb
- -
06 2.7135: Install occupancy sensors $3,123 $7,200 $1,753
37,808
kWh
$1,370
-
kW-mo/yr
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,081 $6,484 $2,494
53,927
kWh
$587
-
kW-mo/yr
- - - - -
08 3.8142: Distill contaminated solvents for reuse $2,899 $5,700 - - - $3,788
-
gal
$(-246.0)
-
lb
$(-370.0) $(-273.0)
09 2.3132: Recharge batteries on during off-peak demand periods $1,250 $1,400 - $1,250
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $45,370 $81,864 $27,034
583,821
kWh
$11,070
-
kW-mo/yr
$(-777.0)
-
Tgal
$3,788
-
gal
$4,898
-
lb
$(-370.0) $(-273.0)
TOTAL IMPLEMENTED $8,225 $6,484 $2,494
53,927
kWh
$587
-
kW-mo/yr
- - $5,144
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs