ITAC Assessment: AS0362
ITAC logo
ITAC Assessment: AS0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Donuts, Danish Pastries, Muffins
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 21,000
ft2
Annual Production 5,040,000
pieces
Production Hrs. Annual 2,016
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,319 430,000
kWh
Electricity Demand $566 1,257
kW-mo/yr
Electricity Fees $9,331 -
Natural Gas $25,885 4,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $577 - $552
7,182
kWh
$25
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $141 $450 $141
1,836
kWh
- -
03 2.7232: Replace existing hvac unit with high efficiency model $922 $4,350 $900
11,693
kWh
$22
-
kW-mo/yr
-
04 4.445: Install equipment to move product $6,720 $4,060 - - $6,720
05 4.445: Install equipment to move product $16,801 $2,470 - - $16,801
TOTAL RECOMMENDED $25,161 $11,330 $1,593
20,711
kWh
$47
-
kW-mo/yr
$23,521
TOTAL IMPLEMENTED $25,020 $10,880 $1,452
18,875
kWh
$47
-
kW-mo/yr
$23,521
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs