ITAC Assessment: UD0563
ITAC logo
ITAC Assessment: UD0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product ferrous metal castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 4,200
ton
Production Hrs. Annual 2,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,942 6,550,117
kWh
Electricity Demand $258,938 18,456
kW-mo/yr
Natural Gas $69,144 16,075
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.131: Modify process to reduce material use/cost $29,762 $4,400 - - $(-729.0)
-
MMBtu
- $1,700
-
lb
$8,750 $20,041 -
02 3.1161: Eliminate/reduce an operation $30,000 $6,648 - - - - - - - $30,000
03 2.4226: Use / purchase optimum sized compressor $26,365 $31,000 $10,775
513,189
kWh
$15,590
-
kW-mo/yr
- - - - - -
04 2.3191: Use demand controller or load shedder $20,536 $3,000 - $30,136
-
kW-mo/yr
- - - $(-9,600.0) - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $17,707 $550 - - - - $1,700
-
lb
$3,150 $12,857 -
06 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) $13,484 $2,645 - - - $13,484
-
lb
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,212 $9,270 $955
45,428
kWh
$2,839
-
kW-mo/yr
- - - $418 - -
08 2.7492: Use proper thickness of insulation on building envelope $2,880 $8,471 - - $2,880
-
MMBtu
- - - - -
TOTAL RECOMMENDED $144,946 $65,984 $11,730
558,617
kWh
$48,565
-
kW-mo/yr
$2,151
-
MMBtu
$13,484
-
lb
$3,400
-
lb
$2,718 $32,898 $30,000
TOTAL IMPLEMENTED $30,577 $40,270 $11,730
558,617
kWh
$18,429
-
kW-mo/yr
- - - $418 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs