ITAC Assessment: TN0298
ITAC logo
ITAC Assessment: TN0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product GAS & ELECTRIC KITCHEN RANGE
NAICS
n/a
SIC 3631: Household Cooking Equipment
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,420 3,056,858
kWh
Natural Gas $144,090 28,265
MMBtu
Fuel Oil #6 $35,285 7,161
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,745 $600 - $2,897
-
MMBtu
$848
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $2,817 $8,000 - $1,999
-
MMBtu
$818
-
MMBtu
03 2.2153: Close off unneeded steam lines $2,873 - - $2,040
-
MMBtu
$833
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $2,202 $2,107 - $1,566
-
MMBtu
$636
-
MMBtu
05 2.2163: Use minimum steam operating pressure $2,580 - - $1,831
-
MMBtu
$749
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,865 $1,500 $3,865
69,754
kWh
- -
07 2.2122: Install / repair insulation on condensate lines $232 $92 - $163
-
MMBtu
$69
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $715 - $715
12,896
kWh
- -
TOTAL RECOMMENDED $19,029 $12,299 $4,580
82,650
kWh
$10,496
-
MMBtu
$3,953
-
MMBtu
TOTAL IMPLEMENTED $4,580 $1,500 $4,580
82,650
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs