| Assessment Year | 1987 |
|---|---|
| Principal Product | GAS & ELECTRIC KITCHEN RANGE |
| NAICS |
n/a
|
| SIC | 3631: Household Cooking Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 450 |
| Plant Area |
n/a
|
| Annual Production | 200,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $169,420 | 3,056,858 |
kWh
|
$0.055 |
| Natural Gas | $144,090 | 28,265 |
MMBtu
|
$5.10 |
| Fuel Oil #6 | $35,285 | 7,161 |
MMBtu
|
$4.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,029 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,580 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,745 | $600 | - |
$2,897
-
MMBtu
|
$848
-
MMBtu
|
|
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $2,817 | $8,000 | - |
$1,999
-
MMBtu
|
$818
-
MMBtu
|
|
| 03 | 2.2153: Close off unneeded steam lines | $2,873 | - | - |
$2,040
-
MMBtu
|
$833
-
MMBtu
|
|
| 04 | 2.2122: Install / repair insulation on condensate lines | $2,202 | $2,107 | - |
$1,566
-
MMBtu
|
$636
-
MMBtu
|
|
| 05 | 2.2163: Use minimum steam operating pressure | $2,580 | - | - |
$1,831
-
MMBtu
|
$749
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,865 | $1,500 |
$3,865
69,754
kWh
|
- | - | |
| 07 | 2.2122: Install / repair insulation on condensate lines | $232 | $92 | - |
$163
-
MMBtu
|
$69
-
MMBtu
|
|
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $715 | - |
$715
12,896
kWh
|
- | - | |
| TOTAL RECOMMENDED | $19,029 | $12,299 |
$4,580
82,650
kWh
|
$10,496
-
MMBtu
|
$3,953
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,580 | $1,500 |
$4,580
82,650
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs