| Assessment Year | 2000 |
|---|---|
| Principal Product | Lithographic Printed Products |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 92 |
| Plant Area |
55,000
ft2
|
| Annual Production | 5,320,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,260 | 2,349,648 |
kWh
|
$0.034 |
| Electricity Demand | $64,754 | 5,278 |
kW-mo/yr
|
$12.27 |
| Electricity Fees | $12,386 | - |
|
- |
| Natural Gas | $4,383 | 972 |
MMBtu
|
$4.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $251,319 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.431: Train operators for maximum operating efficiency | $201,600 | - | - | - | - | - | $201,600 | |
| 02 | 4.611: Begin a practice of predictive / preventative maintenance | $36,000 | - | - | - | - | - | $36,000 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,349 | $13,911 |
$2,737
75,029
kWh
|
$1,612
-
kW-mo/yr
|
- | - | - | |
| 04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,060 | - | - | - | - |
$4,060
-
lb
|
- | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,804 | $2,000 |
$1,320
36,049
kWh
|
$1,484
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,632 | - | - |
$1,632
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $737 | $640 |
$492
13,482
kWh
|
$245
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.7261: Install timers and/or thermostats | $137 | $400 | - | - |
$137
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $251,319 | $16,951 |
$4,549
124,560
kWh
|
$4,973
-
kW-mo/yr
|
$137
-
MMBtu
|
$4,060
-
lb
|
$237,600 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs