| Assessment Year | 2016 |
|---|---|
| Principal Product | Fuel Metering Valves |
| NAICS | 332911: Industrial Valve Manufacturing |
| SIC | 3491: Industrial Valves |
| Sales Range | less than $500 k |
| # of Employees | 85 |
| Plant Area |
34,000
ft2
|
| Annual Production | 80,001
units
|
| Production Hrs. Annual | 2,338
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $90,236 | 484,688 |
kWh
|
$0.19 |
| Electricity Demand | $65,872 | 1,775 |
kW-mo/yr
|
$37.11 |
| Electricity Fees | $16,563 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $173,504 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $130,393 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $96,572 | $386,410 |
$71,545
384,235
kWh
|
$25,027
-
kW-mo/yr
|
- | |
| 02 | 2.7425: Clean or color roof to reduce solar load | $31,891 | $46,500 |
$26,500
142,318
kWh
|
$5,391
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,341 | $22,524 |
$6,907
37,082
kWh
|
$7,209
-
kW-mo/yr
|
$1,225 | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $11,220 | $21,500 |
$6,236
33,493
kWh
|
$4,984
-
kW-mo/yr
|
- | |
| 05 | 2.4235: Remove or close off unneeded compressed air lines | $8,454 | $1,725 |
$4,179
22,445
kWh
|
$4,275
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,109 | $1,101 |
$910
4,897
kWh
|
$4,199
-
kW-mo/yr
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,917 | $200 |
$4,917
26,409
kWh
|
- | - | |
| TOTAL RECOMMENDED | $173,504 | $479,960 |
$121,194
650,879
kWh
|
$51,085
-
kW-mo/yr
|
$1,225 | ||
| TOTAL IMPLEMENTED | $130,393 | $411,960 |
$88,458
475,068
kWh
|
$40,710
-
kW-mo/yr
|
$1,225 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs