ITAC Assessment: WV0159
ITAC logo
ITAC Assessment: WV0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Auot car mats, consoles, seat fabric, auto carpets
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 215,191
ft2
Annual Production 49,920,000
lb
Production Hrs. Annual 6,656
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,770 11,113,130
kWh
Electricity Fees $167,881 -
Natural Gas $567,127 124,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $230,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $120,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $566 $512 $566
4,103
kWh
- - - - -
02 2.3212: Optimize plant power factor $18,085 $24,240 - $18,085 - - - -
03 2.1331: Burn a less expensive grade of fuel $60,045 $26,400 - - $(-19,320.0)
-
MMBtu
$79,365
-
MMBtu
- -
04 2.7241: Install outside air damper / economizer on hvac unit $2,860 $3,870 $2,860
63,599
kWh
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,760 $30 $5,760
128,077
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,054 $100 $1,054
23,447
kWh
- - - - -
07 2.2414: Use waste heat from hot flue gases to preheat $10,691 $4,100 - - $10,691
-
MMBtu
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $448 $175 $448
9,965
kWh
- - - - -
09 3.5212: Regrind, reuse, or sell scrap plastic parts $3,660 $55 - - - - $3,660
-
lb
-
10 3.5311: Recover and reuse waste material $18,805 $50 - - - - $18,805
-
lb
-
11 4.114: Add/modify equipment to improve drying process $108,645 $100,000 - - - - - $108,645
TOTAL RECOMMENDED $230,619 $159,532 $10,688
229,191
kWh
$18,085 $(-8,629.0)
-
MMBtu
$79,365
-
MMBtu
$22,465
-
lb
$108,645
TOTAL IMPLEMENTED $120,133 $100,872 $7,828
165,592
kWh
- - - $3,660
-
lb
$108,645
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs