ITAC Assessment: WI0370
ITAC logo
ITAC Assessment: WI0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Bolts and Screws
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 148,000
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 2,750
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,762 1,106,096
kWh
Electricity Demand $56,049 4,597
kW-mo/yr
Electricity Fees $9,305 -
Natural Gas $26,739 6,225
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,255

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.521: Clear and rent existing space $34,613 - - - - - $34,613
02 4.515: Install shelves / racks to utilize unused space $30,575 $2,955 - - - - $30,575
03 3.7137: Replace cloth rags with paper towels $3,255 - - - - - $3,255
04 2.7243: Improve air circulation with destratification fans / other methods $2,441 $7,400 $(-247.0)
(-6,448)
kWh
- $2,688
-
MMBtu
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,130 - - - - $2,130
-
lb
-
06 2.4221: Install compressor air intakes in coolest locations $1,218 $740 $593
15,826
kWh
$625
-
kW-mo/yr
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,297 $1,410 $(-26.0)
(-586)
kWh
- $1,323
-
MMBtu
- -
08 2.7135: Install occupancy sensors $669 $450 $669
17,585
kWh
- - - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $627 $500 - - $627
-
MMBtu
- -
TOTAL RECOMMENDED $76,825 $13,455 $989
26,377
kWh
$625
-
kW-mo/yr
$4,638
-
MMBtu
$2,130
-
lb
$68,443
TOTAL IMPLEMENTED $3,255 - - - - - $3,255
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs