ITAC Assessment: AS0471
ITAC logo
ITAC Assessment: AS0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fluid milk, water and fruit juice
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 91,200
ft2
Annual Production 400,000
units
Production Hrs. Annual 6,734
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,179,701 15,281,960
kWh
Natural Gas $170,943 19,019
MMBtu
Waste Disposal Costs
Water Usage $295,113 51,595
Tgal
TOTAL YEARLY COSTS $1,645,757
RECOMMENDED SAVINGS* $104,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $85,359 $279,692 $85,359
1,105,677
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $18,374 $5,020 $18,374
238,007
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,003 $2,108 $1,003
12,992
kWh
04 2.4224: Upgrade controls on compressors $157 - $157
2,034
kWh
TOTAL RECOMMENDED $104,893 $286,820 $104,893
1,358,710
kWh
TOTAL IMPLEMENTED $85,516 $279,692 $85,516
1,107,711
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs