| Assessment Year | 2000 |
|---|---|
| Principal Product | Duplicator Presses |
| NAICS |
n/a
|
| SIC | 3861: Photographic Equipment and Supplies |
| Sales Range | $10 M to 50M |
| # of Employees | 111 |
| Plant Area |
107,000
ft2
|
| Annual Production | 650
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $70,083 | 2,087,925 |
kWh
|
$0.034 |
| Electricity Demand | $78,561 | 6,311 |
kW-mo/yr
|
$12.45 |
| Electricity Fees | $12,919 | - |
|
- |
| Natural Gas | $50,662 | 13,636 |
MMBtu
|
$3.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $106,927 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.431: Train operators for maximum operating efficiency | $57,375 | - | n/a | - | - | - | - | $57,375 | - |
| 02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $14,201 | - | n/a | - | - | - |
$14,201
-
lb
|
- | - |
| 03 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $12,036 | $9,000 | n/a | - | - | - |
$12,374
-
lb
|
$(-338.0) | - |
| 04 | 2.7261: Install timers and/or thermostats | $7,036 | $800 | n/a | - | - |
$7,036
-
MMBtu
|
- | - | - |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $4,226 | - | n/a | - | - |
$4,226
-
MMBtu
|
- | - | - |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $3,882 | $5,500 | n/a |
$(-313.0)
(-8,792)
kWh
|
- |
$4,195
-
MMBtu
|
- | - | - |
| 07 | 2.3134: Shift from daytime to nighttime operation | $4,657 | - | n/a | - |
$4,657
-
kW-mo/yr
|
- | - | - | - |
| 08 | 4.821: Pay bills on time to avoid late fees | $2,436 | - | n/a | - | - | - | - | - | $2,436 |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $928 | $1,092 | n/a |
$256
7,034
kWh
|
$672
-
kW-mo/yr
|
- | - | - | - |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $150 | $640 | n/a |
$39
1,172
kWh
|
$111
-
kW-mo/yr
|
- | - | - | - |
| TOTAL RECOMMENDED | $106,927 | $17,032 |
$(-18.0)
(-586)
kWh
|
$5,440
-
kW-mo/yr
|
$15,457
-
MMBtu
|
$26,575
-
lb
|
$57,037 | $2,436 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs