Assessment Year | 1999 |
---|---|
Principal Product | Fabricated Metal Products |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
135,000
ft2
|
Annual Production | 4,000
pieces
|
Production Hrs. Annual | 5,650
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,218 | 2,226,553 |
kWh
|
$0.042 |
Electricity Demand | $89,865 | 7,372 |
kW-mo/yr
|
$12.19 |
Electricity Fees | $30,714 | - |
|
- |
Natural Gas | $30,401 | 5,571 |
MMBtu
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,394 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,752 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.515: Install shelves / racks to utilize unused space | $19,500 | $18,000 | - | - | - | - | - | $19,500 | |
02 | 3.6192: Use a less expensive method of waste removal | $7,993 | - | - | - | - | - |
$7,993
-
lb
|
- | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $7,922 | $500 | - | - |
$7,922
-
MMBtu
|
- | - | - | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $5,378 | - | - | - |
$5,378
-
MMBtu
|
- | - | - | |
05 | 2.7261: Install timers and/or thermostats | $4,145 | $800 | - | - |
$4,145
-
MMBtu
|
- | - | - | |
06 | 3.4154: Eliminate leaks in water lines and valves | $4,075 | - | - | - | - |
$4,075
-
Tgal
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,173 | $1,920 |
$507
11,430
kWh
|
$666
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4322: Use or replace with energy efficient substitutes | $1,365 | $4,374 |
$441
9,965
kWh
|
$924
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.3132: Recharge batteries on during off-peak demand periods | $843 | $800 | - |
$843
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $52,394 | $26,394 |
$948
21,395
kWh
|
$2,433
-
kW-mo/yr
|
$17,445
-
MMBtu
|
$4,075
-
Tgal
|
$7,993
-
lb
|
$19,500 | ||
TOTAL IMPLEMENTED | $16,752 | $7,094 |
$948
21,395
kWh
|
$2,433
-
kW-mo/yr
|
$5,378
-
MMBtu
|
- |
$7,993
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs