Assessment Year | 1999 |
---|---|
Principal Product | Architectural Mill Work |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
73,000
ft2
|
Annual Production | 150
thousand feet
|
Production Hrs. Annual | 4,336
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,044 | 619,578 |
kWh
|
$0.084 |
Electricity Demand | $3,588 | 2,120 |
kW-mo/yr
|
$1.69 |
Electricity Fees | $3,877 | - |
|
- |
Natural Gas | $5,845 | 627 |
MMBtu
|
$9.32 |
LPG | $1,498 | 73 |
MMBtu
|
$20.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,960 | $8,259 | n/a |
$2,401
31,360
kWh
|
$559
-
kW-mo/yr
|
- |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,591 | $1,300 | n/a |
$1,591
20,809
kWh
|
- | - |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,200 | $7,600 | n/a |
$9,200
120,164
kWh
|
- | - |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $423 | $60 | n/a |
$355
4,689
kWh
|
$68
-
kW-mo/yr
|
- |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,157 | $240 | n/a |
$5,168
67,702
kWh
|
$989
-
kW-mo/yr
|
- |
06 | 3.5316: Contract a wood pallet recycling company | $4,639 | $1,060 | n/a | - | - | $4,639 |
07 | 3.6192: Use a less expensive method of waste removal | $3,300 | $30 | n/a | - | - | $3,300 |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $970 | - | n/a | - |
$970
-
kW-mo/yr
|
- |
TOTAL RECOMMENDED | $29,240 | $18,549 |
$18,715
244,724
kWh
|
$2,586
-
kW-mo/yr
|
$7,939 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs