ITAC Assessment: MA0515
ITAC logo
ITAC Assessment: MA0515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Metal fabrication
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 27,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,987 678,528
kWh
Natural Gas $33,253 3,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,438

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $8,976 - - - $8,976
02 2.7491: Insulate glazing, walls, ceilings, and roofs $4,745 $4,805 - $4,745
-
MMBtu
-
03 2.8121: Apply for tax-free status for energy purchases $3,060 - - - $3,060
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $717 - $717
9,667
kWh
- -
TOTAL RECOMMENDED $17,498 $4,805 $717
9,667
kWh
$4,745
-
MMBtu
$12,036
TOTAL IMPLEMENTED $14,438 $4,805 $717
9,667
kWh
$4,745
-
MMBtu
$8,976
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs