ITAC Assessment: UMS004
ITAC logo
ITAC Assessment: UMS004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product die casting
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $1
M
to 5
M
# of Employees 300
Plant Area 10,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,120,000 25,000,000
kWh
Natural Gas $880,000 142,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $472,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $200,000 $200,000 $200,000
-
MMBtu
02 2.1125: Convert to oxyfuel burners $156,000 $250,000 $156,000
-
MMBtu
03 2.2514: Cover open tanks $41,000 $32,000 $41,000
-
MMBtu
04 2.2424: Use heat in flue gases to preheat products or materials $27,600 $75,000 $27,600
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $6,500 - $6,500
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $40,000 $40,000 $40,000
-
MMBtu
07 2.3135: Schedule routine maintenance during non-operating periods $1,300 - $1,300
-
MMBtu
TOTAL RECOMMENDED $472,400 $597,000 $472,400
-
MMBtu
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs