ITAC Assessment: WI0345
ITAC logo
ITAC Assessment: WI0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Gaskets
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $50
M
to 100
M
# of Employees 425
Plant Area 170,609
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,585
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,059 6,048,066
kWh
Electricity Demand $122,860 13,095
kW-mo/yr
Electricity Fees $5,148 -
Natural Gas $52,678 11,689
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.126: Install sensors to detect defects $78,000 $35,000 - - - - - $78,000 - -
02 3.4114: Replace city water with recycled water via cooling tower $21,791 $22,000 $(-1,053.0)
(-32,825)
kWh
$(-593.0)
-
kW-mo/yr
- $23,937
-
Tgal
- - - $(-500.0)
03 2.8121: Apply for tax-free status for energy purchases $15,973 - - - - - - - $15,973 -
04 2.8113: Purchase gas directly from a contract gas supplier $8,207 $500 - - - - - - $8,207 -
05 2.2437: Recover waste heat from equipment $5,553 $2,000 - - $5,553
-
MMBtu
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $2,669 $740 $1,907
59,496
kWh
$762
-
kW-mo/yr
- - - - - -
07 3.7137: Replace cloth rags with paper towels $3,040 - - - - - - - $3,040 -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $2,689 - - - - - $2,689
-
lb
- - -
09 2.3132: Recharge batteries on during off-peak demand periods $2,562 $500 - $2,562
-
kW-mo/yr
- - - - - -
10 2.7261: Install timers and/or thermostats $1,014 $1,400 - - $1,014
-
MMBtu
- - - - -
11 2.7135: Install occupancy sensors $788 $2,400 $226
7,034
kWh
$562
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $142,286 $64,540 $1,080
33,705
kWh
$3,293
-
kW-mo/yr
$6,567
-
MMBtu
$23,937
-
Tgal
$2,689
-
lb
$78,000 $27,220 $(-500.0)
TOTAL IMPLEMENTED $12,571 $4,800 $226
7,034
kWh
$3,124
-
kW-mo/yr
$1,014
-
MMBtu
- - - $8,207 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs