| Assessment Year | 1999 |
|---|---|
| Principal Product | Precision Molded Components |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 67 |
| Plant Area |
60,100
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,742 | 2,219,519 |
kWh
|
$0.040 |
| Electricity Demand | $61,975 | 5,055 |
kW-mo/yr
|
$12.26 |
| Electricity Fees | $9,123 | - |
|
- |
| Natural Gas | $6,718 | 1,301 |
MMBtu
|
$5.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $15,106 | - | n/a |
$15,106
364,009
kWh
|
- | - | - |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,524 | $20,900 | n/a |
$11,524
277,843
kWh
|
- | - | - |
| 03 | 2.7251: Reduce air conditioning load by evaporating water from roof | $4,369 | $7,590 | n/a |
$2,374
57,151
kWh
|
$2,303
-
kW-mo/yr
|
$(-308.0)
-
Tgal
|
- |
| 04 | 2.7135: Install occupancy sensors | $2,410 | $7,200 | n/a |
$1,283
30,774
kWh
|
$1,127
-
kW-mo/yr
|
- | - |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,072 | $210 | n/a |
$1,414
33,998
kWh
|
$658
-
kW-mo/yr
|
- | - |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $434 | $640 | n/a |
$286
7,034
kWh
|
$148
-
kW-mo/yr
|
- | - |
| 07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,906 | $6,000 | n/a |
$1,210
29,015
kWh
|
$696
-
kW-mo/yr
|
- | - |
| 08 | 3.7137: Replace cloth rags with paper towels | $1,671 | - | n/a | - | - | - | $1,671 |
| 09 | 4.232: Lease equipment instead of purchasing | $828 | - | n/a | - | - | - | $828 |
| 10 | 3.1191: Change procedures / equipment / operating conditions | $107 | - | n/a | - | - | - | $107 |
| TOTAL RECOMMENDED | $40,427 | $42,540 |
$33,197
799,824
kWh
|
$4,932
-
kW-mo/yr
|
$(-308.0)
-
Tgal
|
$2,606 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs