ITAC Assessment: WI0338
ITAC logo
ITAC Assessment: WI0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Precision Molded Components
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 67
Plant Area 60,100
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,742 2,219,519
kWh
Electricity Demand $61,975 5,055
kW-mo/yr
Electricity Fees $9,123 -
Natural Gas $6,718 1,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $15,106 - n/a $15,106
364,009
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,524 $20,900 n/a $11,524
277,843
kWh
- - -
03 2.7251: Reduce air conditioning load by evaporating water from roof $4,369 $7,590 n/a $2,374
57,151
kWh
$2,303
-
kW-mo/yr
$(-308.0)
-
Tgal
-
04 2.7135: Install occupancy sensors $2,410 $7,200 n/a $1,283
30,774
kWh
$1,127
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,072 $210 n/a $1,414
33,998
kWh
$658
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $434 $640 n/a $286
7,034
kWh
$148
-
kW-mo/yr
- -
07 2.2621: Modify refrigeration system to operate at a lower pressure $1,906 $6,000 n/a $1,210
29,015
kWh
$696
-
kW-mo/yr
- -
08 3.7137: Replace cloth rags with paper towels $1,671 - n/a - - - $1,671
09 4.232: Lease equipment instead of purchasing $828 - n/a - - - $828
10 3.1191: Change procedures / equipment / operating conditions $107 - n/a - - - $107
TOTAL RECOMMENDED $40,427 $42,540 $33,197
799,824
kWh
$4,932
-
kW-mo/yr
$(-308.0)
-
Tgal
$2,606
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs