ITAC Assessment: WI0335
ITAC logo
ITAC Assessment: WI0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Napkins and Place Mats
NAICS
n/a
SIC 2676: Sanitary Paper Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 120,000
ft2
Annual Production 2,400,000,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,256 3,477,140
kWh
Electricity Demand $25,108 5,061
kW-mo/yr
Electricity Fees $4,703 -
Natural Gas $32,000 5,817
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,186

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $54,000 $20,000 - - - $54,000 -
02 3.7137: Replace cloth rags with paper towels $7,600 - - - - - $7,600
03 2.7261: Install timers and/or thermostats $5,103 $1,400 - - $5,103
-
MMBtu
- -
04 2.7243: Improve air circulation with destratification fans / other methods $4,015 $8,000 $(-388.0)
(-11,430)
kWh
- $4,403
-
MMBtu
- -
05 2.7135: Install occupancy sensors $4,802 $7,200 $3,029
90,270
kWh
$1,773
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $468 $640 $364
9,965
kWh
$104
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $75,988 $37,240 $3,005
88,805
kWh
$1,877
-
kW-mo/yr
$9,506
-
MMBtu
$54,000 $7,600
TOTAL IMPLEMENTED $17,186 $10,040 $(-24.0)
(-1,465)
kWh
$104
-
kW-mo/yr
$9,506
-
MMBtu
- $7,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs