ITAC Assessment: WI0332
ITAC logo
ITAC Assessment: WI0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Bottled Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 90,000
ft2
Annual Production 2,100,000
Tgal
Production Hrs. Annual 5,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,676 1,933,470
kWh
Electricity Demand $21,104 4,638
kW-mo/yr
Electricity Fees $3,831 -
Natural Gas $67,710 13,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 4.441: Install automatic packing equipment $72,000 $150,000 - - - $72,000
02 2.8113: Purchase gas directly from a contract gas supplier $16,089 $500 - - $16,089
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $5,188 $14,000 $(-165.0)
(-5,862)
kWh
- $5,353
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $4,198 $200 - - $4,198
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $535 - - $535
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $368 $226 $282
9,965
kWh
$86
-
kW-mo/yr
- -
TOTAL RECOMMENDED $98,378 $164,926 $117
4,103
kWh
$621
-
kW-mo/yr
$25,640
-
MMBtu
$72,000
TOTAL IMPLEMENTED $88,089 $150,500 - - $16,089
-
MMBtu
$72,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs