| Assessment Year | 1998 |
|---|---|
| Principal Product | Bottled Soft Drinks |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $50 M to 100M |
| # of Employees | 110 |
| Plant Area |
90,000
ft2
|
| Annual Production | 2,100,000
Tgal
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $51,676 | 1,933,470 |
kWh
|
$0.027 |
| Electricity Demand | $21,104 | 4,638 |
kW-mo/yr
|
$4.55 |
| Electricity Fees | $3,831 | - |
|
- |
| Natural Gas | $67,710 | 13,637 |
MMBtu
|
$4.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $98,378 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $88,089 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.441: Install automatic packing equipment | $72,000 | $150,000 | - | - | - | $72,000 | |
| 02 | 2.8113: Purchase gas directly from a contract gas supplier | $16,089 | $500 | - | - |
$16,089
-
MMBtu
|
- | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,188 | $14,000 |
$(-165.0)
(-5,862)
kWh
|
- |
$5,353
-
MMBtu
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $4,198 | $200 | - | - |
$4,198
-
MMBtu
|
- | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $535 | - | - |
$535
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $368 | $226 |
$282
9,965
kWh
|
$86
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $98,378 | $164,926 |
$117
4,103
kWh
|
$621
-
kW-mo/yr
|
$25,640
-
MMBtu
|
$72,000 | ||
| TOTAL IMPLEMENTED | $88,089 | $150,500 | - | - |
$16,089
-
MMBtu
|
$72,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs