| Assessment Year | 1984 |
|---|---|
| Principal Product | POLYURETHANE |
| NAICS |
n/a
|
| SIC | 2822: Synthetic Rubber (Vulcanizable Elastomers) |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 25,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $197,092 | 4,368,699 |
kWh
|
$0.045 |
| Natural Gas | $96,584 | 20,226 |
MMBtu
|
$4.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $31,969 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $18,629 | $12,000 | - |
$18,629
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $11,022 | $792 | - |
$11,022
-
MMBtu
|
|
| 03 | 2.6124: Establish equipment maintenance schedule | $5,685 | $8,880 |
$5,685
126,319
kWh
|
- | |
| 04 | 2.2163: Use minimum steam operating pressure | $908 | - | - |
$908
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,013 | - |
$2,013
44,842
kWh
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $1,336 | - |
$1,336
29,601
kWh
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $966 | - |
$966
21,395
kWh
|
- | |
| 08 | 2.2136: Install / repair insulation on steam lines | $305 | $133 | - |
$305
-
MMBtu
|
|
| TOTAL RECOMMENDED | $40,864 | $21,805 |
$10,000
222,157
kWh
|
$30,864
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $31,969 | $12,925 |
$2,013
44,842
kWh
|
$29,956
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs