| Assessment Year | 1998 |
|---|---|
| Principal Product | Sheet Metal Fabrication |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 32 |
| Plant Area |
27,000
ft2
|
| Annual Production | 18,000
pieces
|
| Production Hrs. Annual | 5,375
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $22,566 | 562,134 |
kWh
|
$0.040 |
| Electricity Demand | $17,869 | 1,464 |
kW-mo/yr
|
$12.21 |
| Electricity Fees | $723 | - |
|
- |
| Natural Gas | $5,585 | 1,006 |
MMBtu
|
$5.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,294 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,936 | - | - |
$5,336
-
kW-mo/yr
|
- | $(-1,400.0) | - | |
| 02 | 2.3132: Recharge batteries on during off-peak demand periods | $487 | - | - |
$487
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,780 | $850 | - | - |
$1,780
-
MMBtu
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $1,054 | $400 | - | - |
$1,054
-
MMBtu
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $381 | $90 |
$252
5,862
kWh
|
$129
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $372 | $640 |
$242
5,569
kWh
|
$130
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.7137: Replace cloth rags with paper towels | $1,039 | - | - | - | - | - | $1,039 | |
| TOTAL RECOMMENDED | $9,049 | $1,980 |
$494
11,431
kWh
|
$6,082
-
kW-mo/yr
|
$2,834
-
MMBtu
|
$(-1,400.0) | $1,039 | ||
| TOTAL IMPLEMENTED | $2,294 | $1,130 |
$494
11,431
kWh
|
$746
-
kW-mo/yr
|
$1,054
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs