ITAC Assessment: UD0446
ITAC logo
ITAC Assessment: UD0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product glass bottles
NAICS
n/a
SIC 3221: Glass Containers
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 504,100
ft2
Annual Production 100,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,159,600 29,676,437
kWh
Natural Gas $1,443,800 525,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $46,224 $42,000 $46,224
-
kWh
-
02 2.7314: Reduce ventilation air $5,261 $4,000 $5,261
134,525
kWh
-
03 2.4226: Use / purchase optimum sized compressor $56,909 $35,000 $54,909
1,403,283
kWh
$2,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,027 $2,280 $2,057
53,341
kWh
$2,970
TOTAL RECOMMENDED $113,421 $83,280 $108,451
1,591,149
kWh
$4,970
TOTAL IMPLEMENTED $56,512 $48,280 $53,542
187,866
kWh
$2,970
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs