Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product hotel and restaurant equipment
NAICS 337127: Institutional Furniture Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,625
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,532 1,341,625
kWh
Electricity Demand $87,054 6,256
kW-mo/yr
Natural Gas $59,215 7,343
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,412

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 4.631: Install an uninteruptable power supply $27,800 - - - - $27,800
-
lb
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,927 $7,500 $10,927
73,698
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,769 $140 $3,293
38,930
kWh
$2,476
-
kW-mo/yr
- -
04 2.6231: Utilize controls to operate equipment only when needed $2,982 $220 $2,982
35,249
kWh
- - -
05 2.2514: Cover open tanks $2,000 $4,500 - - $2,000
-
MMBtu
-
06 2.6212: Turn off equipment during breaks, reduce operating time $688 $350 $688
8,131
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $16,046 $52,243 $9,156
108,221
kWh
$6,890
-
kW-mo/yr
- -
TOTAL RECOMMENDED $66,212 $64,953 $27,046
264,229
kWh
$9,366
-
kW-mo/yr
$2,000
-
MMBtu
$27,800
-
lb
TOTAL IMPLEMENTED $36,412 $60,453 $27,046
264,229
kWh
$9,366
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs