Assessment Year | 1998 |
---|---|
Principal Product | Washroom Accessories |
NAICS |
n/a
|
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $10 M to 50M |
# of Employees | 112 |
Plant Area |
120,879
ft2
|
Annual Production | 482,500
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,662 | 1,328,546 |
kWh
|
$0.032 |
Electricity Demand | $30,453 | 3,590 |
kW-mo/yr
|
$8.48 |
Electricity Fees | $720 | - |
|
- |
Natural Gas | $36,609 | 6,578 |
MMBtu
|
$5.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,421 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $21,516 | $1,000 | - | - | - | - | $21,516 | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $11,052 | $500 | - | - |
$11,052
-
MMBtu
|
- | - | - | |
03 | 2.7261: Install timers and/or thermostats | $6,348 | $1,000 | - | - |
$6,348
-
MMBtu
|
- | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $4,205 | $4,500 |
$(-262.0)
(-7,620)
kWh
|
- |
$4,467
-
MMBtu
|
- | - | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $4,677 | $9,000 |
$(-23.0)
(-586)
kWh
|
- | - |
$4,700
-
lb
|
- | - | |
06 | 2.3134: Shift from daytime to nighttime operation | $3,817 | - | - |
$6,048
-
kW-mo/yr
|
- | - | $(-2,231.0) | - | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $1,087 | $600 | - |
$1,087
-
kW-mo/yr
|
- | - | - | - | |
08 | 4.321: Optimize production lot sizes and inventories | $2,376 | - | - | - | - | - | - | $2,376 | |
09 | 2.4221: Install compressor air intakes in coolest locations | $343 | $740 |
$171
4,982
kWh
|
$172
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $55,421 | $17,340 |
$(-114.0)
(-3,224)
kWh
|
$7,307
-
kW-mo/yr
|
$21,867
-
MMBtu
|
$4,700
-
lb
|
$19,285 | $2,376 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs