ITAC Assessment: UM0222
ITAC logo
ITAC Assessment: UM0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Fabricated Assemblies
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,569 3,053,729
kWh
Electricity Demand $79,422 9,252
kW-mo/yr
Electricity Fees $9,924 -
Natural Gas $227,448 34,803
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1114: Limit and control secondary combustion air in furnace $28,900 $10,000 - - $28,900
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $23,074 $1,750 - - $23,074
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,900 $1,275 $12,390
133,220
kWh
$1,510
-
kW-mo/yr
-
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,523 $2,000 $2,523
27,130
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,261 $4,000 $895
9,620
kWh
$366
-
kW-mo/yr
-
TOTAL RECOMMENDED $69,658 $19,025 $15,808
169,970
kWh
$1,876
-
kW-mo/yr
$51,974
-
MMBtu
TOTAL IMPLEMENTED $65,874 $13,025 $12,390
133,220
kWh
$1,510
-
kW-mo/yr
$51,974
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs