ITAC Assessment: MS0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pipe Flanges and Fittings
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 51,500
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,147 15,913,541
kWh
Electricity Demand $56,382 50,643
kW-mo/yr
Electricity Fees $118,902 -
Natural Gas $29,133 9,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,103

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Liquid (haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,103 $760 $9,103
422,919
kWh
- -
02 2.7134: Use photocell controls $401 $474 $401
18,757
kWh
- -
03 2.3212: Optimize plant power factor $15,682 $58,500 - $15,682 -
04 3.4111: Use closed cycle process to minimize waste water production $21,677 $34,294 - - $21,677
-
gal
TOTAL RECOMMENDED $46,863 $94,028 $9,504
441,676
kWh
$15,682 $21,677
-
gal
TOTAL IMPLEMENTED $9,103 $760 $9,103
422,919
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs