ITAC Assessment: WI0314
ITAC logo
ITAC Assessment: WI0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Lithographic Commercial Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 110,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,660 2,960,141
kWh
Electricity Demand $97,499 8,002
kW-mo/yr
Electricity Fees $2,424 -
Natural Gas $29,891 6,384
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.211: Consider use / purchase of bulk materials where possible $147,023 - - - - $944
-
lb
- $146,079 -
02 4.514: Re-arrange equipment layout to reduce handling costs $30,000 - - - - - $30,000 - -
03 4.445: Install equipment to move product $15,000 $6,350 - - - - $15,000 - -
04 3.8142: Distill contaminated solvents for reuse $4,880 $10,000 $(-22.0)
(-586)
kWh
- - - - - $4,902
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,605 $4,000 $1,907
42,204
kWh
$1,698
-
kW-mo/yr
- - - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,567 - - - - $2,567
-
lb
- - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $1,520 - $(-4.0)
(-293)
kWh
- - $2,274
-
lb
$(-750.0) - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $820 $1,332 - - $820
-
MMBtu
- - - -
09 2.4221: Install compressor air intakes in coolest locations $506 $640 $431
9,672
kWh
$75
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $205,921 $22,322 $2,312
50,997
kWh
$1,773
-
kW-mo/yr
$820
-
MMBtu
$5,785
-
lb
$44,250 $146,079 $4,902
TOTAL IMPLEMENTED $35,945 $5,332 $1,903
41,911
kWh
$1,698
-
kW-mo/yr
$820
-
MMBtu
$2,274
-
lb
$29,250 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs