| Assessment Year | 1997 |
|---|---|
| Principal Product | Vacuum-formed ceramic fiber shapes |
| NAICS |
n/a
|
| SIC | 3297: Nonclay Refractories |
| Sales Range | $5 M to 10M |
| # of Employees | 48 |
| Plant Area |
37,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $33,424 | 1,085,580 |
kWh
|
$0.031 |
| Electricity Demand | $26,774 | 2,470 |
kW-mo/yr
|
$10.84 |
| Electricity Fees | $767 | - |
|
- |
| Natural Gas | $112,733 | 23,619 |
MMBtu
|
$4.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,096 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $24,171 | $500 | - | - | - | - | - | $24,171 | |
| 02 | 4.431: Train operators for maximum operating efficiency | $14,040 | - | - | - | - | - | $14,040 | - | |
| 03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,884 | - | - | - | - |
$4,884
-
lb
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $721 | - |
$444
13,775
kWh
|
$277
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $873 | $640 |
$548
16,706
kWh
|
$325
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $331 | $425 | - | - |
$331
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $45,020 | $1,565 |
$992
30,481
kWh
|
$602
-
kW-mo/yr
|
$331
-
MMBtu
|
$4,884
-
lb
|
$14,040 | $24,171 | ||
| TOTAL IMPLEMENTED | $26,096 | $1,565 |
$992
30,481
kWh
|
$602
-
kW-mo/yr
|
$331
-
MMBtu
|
- | - | $24,171 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs