ITAC Assessment: WI0307
ITAC logo
ITAC Assessment: WI0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Vacuum-formed ceramic fiber shapes
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 37,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,424 1,085,580
kWh
Electricity Demand $26,774 2,470
kW-mo/yr
Electricity Fees $767 -
Natural Gas $112,733 23,619
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $24,171 $500 - - - - - $24,171
02 4.431: Train operators for maximum operating efficiency $14,040 - - - - - $14,040 -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,884 - - - - $4,884
-
lb
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $721 - $444
13,775
kWh
$277
-
kW-mo/yr
- - - -
05 2.4221: Install compressor air intakes in coolest locations $873 $640 $548
16,706
kWh
$325
-
kW-mo/yr
- - - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $331 $425 - - $331
-
MMBtu
- - -
TOTAL RECOMMENDED $45,020 $1,565 $992
30,481
kWh
$602
-
kW-mo/yr
$331
-
MMBtu
$4,884
-
lb
$14,040 $24,171
TOTAL IMPLEMENTED $26,096 $1,565 $992
30,481
kWh
$602
-
kW-mo/yr
$331
-
MMBtu
- - $24,171
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings