ITAC Assessment: IP0047
ITAC logo
ITAC Assessment: IP0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Baked Sweet Goods, Donuts
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 290
Plant Area 231,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,709 7,352,800
kWh
Electricity Demand $160,221 14,204
kW-mo/yr
Electricity Fees $45,590 -
Natural Gas $279,414 43,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,547

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,458 $163 $11,458
220,355
kWh
- - - -
02 2.7135: Install occupancy sensors $2,848 $798 $2,848
54,772
kWh
- - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,543 $900 - - - $2,543
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,968 $623 $1,389
26,707
kWh
$579
-
kW-mo/yr
- - -
05 4.812: Apply for investment incentives $30,801 $10,000 - - $30,801 - -
06 4.812: Apply for investment incentives $10,288 $5,000 - - - - $10,288
07 2.4221: Install compressor air intakes in coolest locations $150 $380 - - - $150
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,755 $20,898 $2,599
49,990
kWh
$1,156
-
kW-mo/yr
- - -
09 2.3212: Optimize plant power factor $5,199 $23,927 - - $5,199 - -
TOTAL RECOMMENDED $69,010 $62,689 $18,294
351,824
kWh
$1,735
-
kW-mo/yr
$36,000 $2,693
-
MMBtu
$10,288
TOTAL IMPLEMENTED $52,547 $15,163 $11,458
220,355
kWh
- $30,801 - $10,288
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs