ITAC Assessment: OK0136
ITAC logo
ITAC Assessment: OK0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product HEAT TREATING SERVICE
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,990 1,616,061
kWh
Natural Gas $85,576 23,619
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $644

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $124 - $124
3,810
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $33 $92 $33
879
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $80 $43 $80
2,052
kWh
-
04 2.7261: Install timers and/or thermostats $163 $165 - $163
-
MMBtu
05 2.2511: Insulate bare equipment $407 $300 $407
12,309
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,353 $11,300 - $3,353
-
MMBtu
TOTAL RECOMMENDED $4,160 $11,900 $644
19,050
kWh
$3,516
-
MMBtu
TOTAL IMPLEMENTED $644 $435 $644
19,050
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs