ITAC Assessment: ND0186
ITAC logo
ITAC Assessment: ND0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Hydraulic Cylinders
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 8,600
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,356 1,601,700
kWh
Natural Gas $37,412 9,287
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,265 $1,380 $8,265
141,852
kWh
-
02 2.4133: Use most efficient type of electric motors $5,718 $8,060 $5,718
98,183
kWh
-
03 2.7444: Close holes and openings in building such as broken windows $766 $225 - $766
-
MMBtu
04 2.7135: Install occupancy sensors $1,678 $2,900 $1,678
28,722
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,197 $1,035 $1,197
20,516
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $182 $638 - $182
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $233 $460 $233
4,103
kWh
-
TOTAL RECOMMENDED $18,039 $14,698 $17,091
293,376
kWh
$948
-
MMBtu
TOTAL IMPLEMENTED $16,858 $13,375 $16,858
289,273
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs