Assessment Year | 1997 |
---|---|
Principal Product | Bus and Truck Seats |
NAICS |
n/a
|
SIC | 3393: |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
75,000
ft2
|
Annual Production | 162,500
pieces
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,337 | 790,152 |
kWh
|
$0.040 |
Electricity Demand | $39,146 | 3,026 |
kW-mo/yr
|
$12.94 |
Electricity Fees | $4,615 | - |
|
- |
Natural Gas | $36,950 | 7,934 |
MMBtu
|
$4.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,195 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $15,413 | $3,500 | - | - | - | - | $15,413 | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $15,195 | $2,297 | - | - |
$15,195
-
MMBtu
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,007 | - | - |
$1,020
-
kW-mo/yr
|
- | $(-13.0) | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $416 | $610 |
$218
5,275
kWh
|
$198
-
kW-mo/yr
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $366 | $1,280 |
$201
4,689
kWh
|
$165
-
kW-mo/yr
|
- | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $254 | - |
$130
3,224
kWh
|
$124
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $32,651 | $7,687 |
$549
13,188
kWh
|
$1,507
-
kW-mo/yr
|
$15,195
-
MMBtu
|
$(-13.0) | $15,413 | ||
TOTAL IMPLEMENTED | $15,195 | $2,297 | - | - |
$15,195
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs