ITAC Assessment: WI0292
ITAC logo
ITAC Assessment: WI0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Bus and Truck Seats
NAICS
n/a
SIC 3393:
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 75,000
ft2
Annual Production 162,500
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,337 790,152
kWh
Electricity Demand $39,146 3,026
kW-mo/yr
Electricity Fees $4,615 -
Natural Gas $36,950 7,934
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,651 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $15,413 $3,500 - - - - $15,413
02 2.7447: Install vinyl strip / high speed / air curtain doors $15,195 $2,297 - - $15,195
-
MMBtu
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,007 - - $1,020
-
kW-mo/yr
- $(-13.0) -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $610 $218
5,275
kWh
$198
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $366 $1,280 $201
4,689
kWh
$165
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $254 - $130
3,224
kWh
$124
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $32,651 $7,687 $549
13,188
kWh
$1,507
-
kW-mo/yr
$15,195
-
MMBtu
$(-13.0) $15,413
TOTAL IMPLEMENTED $15,195 $2,297 - - $15,195
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs