ITAC Assessment: WI0286
ITAC logo
ITAC Assessment: WI0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Water treatment equipment
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 301
Plant Area 207,500
ft2
Annual Production 100
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,455 4,388,335
kWh
Electricity Demand $68,992 9,150
kW-mo/yr
Electricity Fees $14,785 -
Natural Gas $119,604 39,929
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $29,011 $1,000 - - - - - $3,481
-
lb
- $25,530
02 2.7314: Reduce ventilation air $6,908 $1,000 $321
12,309
kWh
- $6,587
-
MMBtu
- - - - -
03 3.8122: Use tight-fitting lids on material containers to reduce voc emissions $2,999 $1,000 - - - - - - $750 $2,249
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,138 $5,000 - - - - - $2,138
-
lb
- -
05 2.3134: Shift from daytime to nighttime operation $26,499 - - $27,899
-
kW-mo/yr
- - - - $(-1,400.0) -
06 2.7232: Replace existing hvac unit with high efficiency model $19,520 $88,000 - - $4,520
-
MMBtu
- - - $15,000 -
07 2.2621: Modify refrigeration system to operate at a lower pressure $6,085 $15,000 $3,947
152,989
kWh
$2,138
-
kW-mo/yr
- - - - - -
08 2.7251: Reduce air conditioning load by evaporating water from roof $2,230 $10,230 $3,034
117,526
kWh
$2,911
-
kW-mo/yr
- $(-3,715.0)
-
Tgal
- - - -
09 2.7261: Install timers and/or thermostats $18,978 $3,600 - - $18,978
-
MMBtu
- - - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,310 $210 $794
30,774
kWh
$516
-
kW-mo/yr
- - - - - -
11 3.4151: Minimize water usage $274 - - - - $274
-
Tgal
- - - -
12 3.5315: Lease / purchase baler; sell cardboard to recycler $953 - - - - - $953
-
lb
- - -
13 2.7135: Install occupancy sensors $575 $450 $575
22,274
kWh
- - - - - - -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $527 $328 $318
12,309
kWh
$209
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $118,007 $125,818 $8,989
348,181
kWh
$33,673
-
kW-mo/yr
$30,085
-
MMBtu
$(-3,441.0)
-
Tgal
$953
-
lb
$5,619
-
lb
$14,350 $27,779
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs