| Assessment Year | 1996 |
|---|---|
| Principal Product | Micro electric circuitry, power supply, automotive, aerospac |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
35,000
ft2
|
| Annual Production | 3,180,000
pieces
|
| Production Hrs. Annual | 4,188
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $48,005 | 1,733,294 |
kWh
|
$0.028 |
| Electricity Demand | $33,611 | 3,841 |
kW-mo/yr
|
$8.75 |
| Electricity Fees | $4,175 | - |
|
- |
| Natural Gas | $8,754 | 1,813 |
MMBtu
|
$4.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $283,502 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,786 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7314: Reduce ventilation air | $210,013 | $64,100 |
$(-1,633.0)
(-56,272)
kWh
|
$(-123.0)
-
kW-mo/yr
|
$(-38,231.0)
-
MMBtu
|
- | - | - | - | - | $250,000 | |
| 02 | 3.2176: Increase use of automation | $60,000 | $140,000 | - | - | - | - | - | - | $60,000 | - | - | |
| 03 | 2.7211: Clean and maintain refrigerant condensers and towers | $2,786 | - |
$1,128
38,687
kWh
|
$1,818
-
kW-mo/yr
|
- | - | - | - | $(-160.0) | - | - | |
| 04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,042 | $3,100 |
$577
19,930
kWh
|
$465
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,605 | $8,500 | - | - | - | - | - |
$2,605
-
lb
|
- | - | - | |
| 06 | 2.7251: Reduce air conditioning load by evaporating water from roof | $2,549 | $10,500 |
$2,207
75,909
kWh
|
$2,178
-
kW-mo/yr
|
- |
$(-1,836.0)
-
Tgal
|
- | - | - | - | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,680 | $1,216 | - | - |
$1,680
-
MMBtu
|
- | - | - | - | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,347 | $2,521 |
$774
26,671
kWh
|
$573
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
| 09 | 3.1191: Change procedures / equipment / operating conditions | $1,100 | - | - | - | - | - |
$1,100
-
gal
|
- | - | - | - | |
| 10 | 2.8113: Purchase gas directly from a contract gas supplier | $380 | $500 | - | - | - | - | - | - | - | $380 | - | |
| TOTAL RECOMMENDED | $283,502 | $230,437 |
$3,053
104,925
kWh
|
$4,911
-
kW-mo/yr
|
$(-36,551.0)
-
MMBtu
|
$(-1,836.0)
-
Tgal
|
$1,100
-
gal
|
$2,605
-
lb
|
$59,840 | $380 | $250,000 | ||
| TOTAL IMPLEMENTED | $2,786 | - |
$1,128
38,687
kWh
|
$1,818
-
kW-mo/yr
|
- | - | - | - | $(-160.0) | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs