ITAC Assessment: WI0285
ITAC logo
ITAC Assessment: WI0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Micro electric circuitry, power supply, automotive, aerospac
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 35,000
ft2
Annual Production 3,180,000
pieces
Production Hrs. Annual 4,188
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,005 1,733,294
kWh
Electricity Demand $33,611 3,841
kW-mo/yr
Electricity Fees $4,175 -
Natural Gas $8,754 1,813
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $283,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.7314: Reduce ventilation air $210,013 $64,100 $(-1,633.0)
(-56,272)
kWh
$(-123.0)
-
kW-mo/yr
$(-38,231.0)
-
MMBtu
- - - - - $250,000
02 3.2176: Increase use of automation $60,000 $140,000 - - - - - - $60,000 - -
03 2.7211: Clean and maintain refrigerant condensers and towers $2,786 - $1,128
38,687
kWh
$1,818
-
kW-mo/yr
- - - - $(-160.0) - -
04 2.2621: Modify refrigeration system to operate at a lower pressure $1,042 $3,100 $577
19,930
kWh
$465
-
kW-mo/yr
- - - - - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,605 $8,500 - - - - - $2,605
-
lb
- - -
06 2.7251: Reduce air conditioning load by evaporating water from roof $2,549 $10,500 $2,207
75,909
kWh
$2,178
-
kW-mo/yr
- $(-1,836.0)
-
Tgal
- - - - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,680 $1,216 - - $1,680
-
MMBtu
- - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,347 $2,521 $774
26,671
kWh
$573
-
kW-mo/yr
- - - - - - -
09 3.1191: Change procedures / equipment / operating conditions $1,100 - - - - - $1,100
-
gal
- - - -
10 2.8113: Purchase gas directly from a contract gas supplier $380 $500 - - - - - - - $380 -
TOTAL RECOMMENDED $283,502 $230,437 $3,053
104,925
kWh
$4,911
-
kW-mo/yr
$(-36,551.0)
-
MMBtu
$(-1,836.0)
-
Tgal
$1,100
-
gal
$2,605
-
lb
$59,840 $380 $250,000
TOTAL IMPLEMENTED $2,786 - $1,128
38,687
kWh
$1,818
-
kW-mo/yr
- - - - $(-160.0) - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs