ITAC Assessment: UL0197
ITAC logo
ITAC Assessment: UL0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Dust Control Equipment
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 56,000
ft2
Annual Production 1,440
pieces
Production Hrs. Annual 3,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,046 1,220,399
kWh
Electricity Demand $43,972 4,392
kW-mo/yr
Electricity Fees $1,023 -
Natural Gas $52,901 11,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings By-product Production Savings
01 2.3212: Optimize plant power factor $8,627 $8,912 - - $8,627 - - -
02 2.7261: Install timers and/or thermostats $503 $400 - - - $503
-
MMBtu
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $938 $20 $469
19,050
kWh
$469
-
kW-mo/yr
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $10,824 $1,700 - - - - $10,824
-
lb
-
05 3.5316: Contract a wood pallet recycling company $7,512 - - - - - $7,512
-
lb
-
06 3.7134: Wash and reuse rags on-site $2,925 $4,500 - - - - - $2,925
TOTAL RECOMMENDED $31,329 $15,532 $469
19,050
kWh
$469
-
kW-mo/yr
$8,627 $503
-
MMBtu
$18,336
-
lb
$2,925
TOTAL IMPLEMENTED $21,261 $6,200 - - - - $18,336
-
lb
$2,925
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs