ITAC Assessment: WI0281
ITAC logo
ITAC Assessment: WI0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Steel Tubing
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 431,235
ft2
Annual Production 110,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,150 9,856,389
kWh
Electricity Demand $368,767 26,989
kW-mo/yr
Electricity Fees $34,119 -
Natural Gas $168,635 36,070
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $33,184 $80,000 $(-5,866.0)
(-150,059)
kWh
- $39,050
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $30,144 $12,950 $26,604
680,539
kWh
$20,922
-
kW-mo/yr
$(-17,382.0)
-
MMBtu
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $19,250 - - $19,250
-
kW-mo/yr
- - -
04 3.4114: Replace city water with recycled water via cooling tower $19,457 $15,000 $1,167
29,894
kWh
- - $18,290
-
Tgal
-
05 2.7243: Improve air circulation with destratification fans / other methods $11,051 $26,220 $(-2,493.0)
(-63,892)
kWh
- $13,544
-
MMBtu
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,879 - - - - - $8,879
-
lb
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,899 $210 $4,729
121,043
kWh
$2,170
-
kW-mo/yr
- - -
08 2.4221: Install compressor air intakes in coolest locations $870 $740 $306
7,913
kWh
$564
-
kW-mo/yr
- - -
09 2.1123: Install automatic stack damper $931 $1,100 - - $931
-
MMBtu
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,554 $701 $1,745
44,549
kWh
$809
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $133,219 $136,921 $26,192
669,987
kWh
$43,715
-
kW-mo/yr
$36,143
-
MMBtu
$18,290
-
Tgal
$8,879
-
lb
TOTAL IMPLEMENTED $18,332 $911 $6,474
165,592
kWh
$2,979
-
kW-mo/yr
- - $8,879
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs